SlideShow

  • Power Plant 2 Construction
  • Gas pipeline
  • The rebar assembly of the foundation of the LM-600
  • Aerial view
  • Freshly poured concrete for the LM-6000 foundation
  • Turbine on its way to Power Plant 2 by barge
  • Turbine progress toward Freeport
  • Loading turbine for delivery to Power Plant 2
  • Unloading turbine at dock in Freeport
  • Erecting 2nd stack section
  • Centerline equipment installation overview
  • Chiller module installation on foundation
  • Transformer-swi foundations
  • Erection of final stack section
  • Sound wall foundation reinforcement
  • Sound wall columns
  • Sound wall columns2
  • LM-6000
  • Gas metering station piping
  • Gas compressor enclosure
  • Sound wall stanchions - looking east
  • Fuel oil forwarding skid
  • Sound wall
  • Elevation view - combustible turbine generator-SCR
  • Installation of sound wall sections
  • Modular substation erection at Power Plant 2
  • Plant overview
  • Completed sound wall
  • Water tie-ins at cooling tower
  • Plant 2 overview
  • Plant 2 overview2
  • Plant 2 overview3

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to Power Plant 2 Construction photos